Home » TRAIN » DOWNLOADS » RAILWORKS » RAS - RAILWORKS ACTIVITIES VOL. 6


RAS - RAILWORKS ACTIVITIES VOL. 6

RAS - RAILWORKS ACTIVITIES VOL. 6

PID: 5634
Available since: 07/15/2011.
Publisher: Roussillon Aéro Simulation
Sold by Roussillon Aéro Simulation
Tags: Train Roussillon Aero Simulation 
EUR 5.36
without VAT EUR 4.50
Delivery Method:

           Review it now!     On my Wishlist     BUY NOW! 
HOMEPAGE http://www.roussillonaerosimulation.com
SUPPORT mathieu.ohare@roussillonaerosimulation.com
DELIVERY METHOD DIRECT DOWNLOAD
FILESIZE 12MB
REGISTRATION KEY This product does not have a registration key, you can simply execute the downloaded file to install
REQUIREMENTS Railworks with the add-on "Portsmouth Direct Line"

Drive the Class 450 EMUU SouthWestTrain on the "Portsmouth Direct Line". 2 extra scenarios on the "Isle of Wight" with the Class 450 EMU.
 

-London – Portsmouth Daily Service 01
-Difficulty: Easy
-Duration: 70 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 14/07/2010
-Weather: Clear

Today you take control of Class 470 EMU SouthWestTrains. The train from London and in the direction of Portsmouth has just arrived in the station of Woking. You have to replace the driver and end the route until Portsmouth with some stops during the journey. Once arrived, you will have to park your train to Fratton Depot 4. You will have to change manually some junctions to reach Fratton Depot 4. Follow the instructions (F1 key).Have safe journey.
 

-Portsmouth – London Daily Service 01
-Difficulty: Medium
-Duration: 70 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 15/10/2010
-Weather: Rain
 

Drive the Portsmouth – London train. You will start at Portsmouth and will have a few stops on your way. Keep scheduled. Once arrived at Woking, another driver will finish the travel to London.
Have a safe journey.
 

-Portsmouth Southsea – Guilford Daily Service 01
-Difficulty: Easy
-Duration: 75 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 04/01/2011
-Weather: Snow
 

You have to drive the Portsmouth Southsea - Guilford Daily Service 01. Your train is parked at Fratton Depot 4. To reach Portsmouth Southsea 3, you will have to change manually the junctions. It is imperative to find you self on the left track when you are leaving Fratton Depot. Once arrived at Portsmouth Southsea 3, embarked the first passengers and drive to Guilford. You have to make a stop at all the stations. When all the passengers have left the train at Guilford, you will have to park your train at Guilford Up Yard Cripple. There also, you will have to modify manually the junctions.
Have a safe journey.
 

-Guilford - Portsmouth Southsea Daily Service 01
-Difficulty: Medium
-Duration: 75 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 22/04/2011
-Weather: Clear
 

Today you have to drive the Guilford - Portsmouth SouthSea Daily Service 01. You have to make a stop at all the stations. Once arrived at Portsmouth SouthSea, you will have to park your train to Fratton Depot 4. You will have to for it change the junction manually.
Have a safe journey.
 

-Havant – Haslemere - Havant Daily Service 01
-Difficulty: Medium
-Duration: 85 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 20/05/2011
-Weather: Clear
 

Drive the Havant - Haslemere - Havant Daily service 01. Once arrived at Haslemere, you will have to drive back to Havant. You have to make a stop at all the stations. Once arrived at Havant, you will have orders to park your train. You will have to modify manually some junctions.
Have a safe journey.
 

-Woking – Haslemere - Woking Daily Service 01
-Difficulty: Medium
-Duration: 60 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 20/10/2010
-Weather: Rain
 

Drive the train Woking - Haslemere - Woking Daily Service 01. You have to make a stop at every station. Once arrived at Haslemere, you have to assure the return service. You have to respect schedules. Attention on the entry into the station of Woking during the service return, a tourist's train can be on your track. Stop and allow it to pass.
Have a safe journey.
 

-Coal Freight
-Difficulty: Medium
-Duration: 65 minutes
-Train: Class 37 EWS
-Date: 27/08/2010
-Weather: Clear
 

A steam ship has just arrived at Portsmouth. You have to deliver some coal for that boat. You will start at Woking where you will have to couple some wagons full of coal. You have to deliver it at Fratton Reception 1. Once arrived at destination, a truck will finish the job.
Have a safe journey.
 

-Night Freight Service 01
-Difficulty: Medium
-Duration: 85 minutes
-Train: Class 37 EWS
-Date: 17/11/2010
-Weather: Foggy Showers
 

Drive Night Freight Service 01. You will start at Fratton Depot. Your first task will be to assemble the train. To leave Fratton Depot, you will have to change manually the junctions. Assemble the train (freight cars, tractor and tankers). You will have to make two stop on the route which will lead you until Woking.
Have a safe journey.
 

-Haslemere – Woking – Haslemere Special
-Difficulty: Medium
-Duration: 65 minutes
-Train: Class 450 EMU SouthWestTrains
-Date: 24/12/2010
-Weather: Foggy Bad Snow
 

Tomorrow its Christmas. Transport passengers to Guilford and Woking. Once arrived at Woking, return to Haslemere. You will then have to park your train at Guilford.
Have a safe journey.
 

-Bath Daily Freight Service
-Difficulty: Medium
-Duration: 65 minutes
-Train: Class 37 EWS
-Date: 27/06/2010
-Weather: Clear
 

Transport freight from Templecombe to Bath. You will have to couple first milk tanks at Templecombe. You will have to change the junctions manually. Once you have made the first operation you will have to drive to Everchreec Junction. When you leave Templecombe, you have to pass by Templecombe Upper 1 and then you have to be on the left track. You will have to change the junctions manually at Everchreec Junction and Bath.
Have a safe journey.
 

Scenario line: The Isle of Wight
 

-Shanklin – Ryde Pier Head Direct Service
-Difficulty: Easy
-Duration: 40 minutes
-Train: Class 450 EMU SouthWestTrain
-Date: 20/02/2011
-Weather: Overcast Rain
 

Drive the Shanklin - Ryde Pier Head Direct Service. Once arrived at Ryde Pier Head, you have to drive back to Shanklin.
Have a safe journey.
 

-Ryde Pier Head – Shanklin Daily Service
-Difficulty: Medium
-Duration: 60 minutes
-Train: Class 450 EMU SouthWestTrain
-Date: 04/07/2011
-Weather: Clear
 

Today you have to drive the train "Ryde Pier Head - Shanklin Daily Service”. You have to respect a stop at all the stations. Once arrived at Shanklin, change cab side and make the return trip with a stop at all the stations also. It is imperative to respect schedules.
Have a safe journey