Home » COMBOIOS » DOWNLOADS » RAILWORKS » RAS - RAILWORKS ACTIVITIES VOL. 8


RAS - RAILWORKS ACTIVITIES VOL. 8

RAS - RAILWORKS ACTIVITIES VOL. 8

PID: 5963
Adicionado em: 12/07/2011.
Editora: Roussillon Aéro Simulation
Vendido por Roussillon Aéro Simulation
Tags: Train 
EUR 5.68
sem IVA EUR 4.77
Forma de Entrega:

           Escreva a sua Opinião!     Na Wishlist     Comprar 
HOMEPAGE http://www.roussillonaerosimulation.com
APOIO mathieu.ohare@roussillonaerosimulation.com
MÉTODO DE ENTREGA DOWNLOAD DIRECTO
TAMANHO DO ARQUIVO 5MB
PROTEÇÃO Este produto não tem uma chave de registro, você pode simplesmente executar o arquivo baixado para instalar
REQUISITOS Railworks and the "Horseshoe Curve" line installed.

As an expert "Horseshoe Curve" driver, many hours of driving and handling are waiting for you.
You will drive the EMD F7 Pennsy (passengers transport) and the EMD GP7 Pennsy (Freight) between Altoona and Johnstown via Cresson. Have fun.
 

Altoona - Johnstown Express 9803
Difficulty: Medium
Duration: 65 minutes
Train: EMD F7 Pennsy
Date: 14/07/1957
Weather: Clear 

Today you have to drive the "Altoona - Johnstown Express Service 01". This is a direct train to Johnstown with no stop. Timetable scenario. Have a safe journey. 

Johnstown - Altoona Express 9828
Difficulty: Medium
Duration: 65 minutes
Train: EMD F7 Pennsy
Date: 18/11/1958
Weather: Overcast Showers

Today you have to drive the "Johnstown - Altoona Express 9828". This a direct train to Altoona with no stop. Timetable scenario. Have a safe journey. 

Altoona - Johnstown 9818
Difficulty: Medium
Duration: 75 minutes
Train: EMD F7 Pennsy
Date: 14/05/1957
Weather: Clear

Today you will drive the "Altoona - Johnstown 9818" daily service. Stop at all stations. Timetable scenario. Have a safe journey. 

Johnstown - Altoona 9796
Difficulty: Medium
Duration: 75 minutes
Train: EMD F7 Pennsy
Date: 25/10/1958
Weather: Foggy Rain

Today you have to drive the "Johnstown - Altoona 9796". This is a daily service with a stop at every station. When you will be at Altoona, you will have to check the junctions an maybe change them manualy. Timetable scenario. Have a safe journey. 

Altoona - Gallitzin - Altoona 9822
Difficulty: Medium
Duration: 55 minutes
Train: EMD F7 Pennsy
Date: 24/12/1958
Weather: Foggy Bad Snow

Christmass is coming. People from Gallitzin needs to come down at Altoona for their last presents. Drive the "Altoona - Galltzin - Altoona 9822". Timetable scenario. Have a safe journey. 

Freight 8576
Difficulty: Easy
Duration: 75 minutes
Train: EMD GP7 Pennsy
Date: 25/07/1958
Weather: Clear

Today you have to drive the "Freight 8576" train from Altoona to Johnstown (C Wwd Classification Yard 2). You will only have to drive this train, no coupling or uncoupling have to be done. Think about checking the junctions. If there are not in the good position, change them manually.  Have a safe journey. 

Freight 8506
Difficulty: Medium
Duration: 90 minutes
Train: EMD GP7 Pennsy
Date: 14/01/1959
Weather: Foggy Bad snow

Altoona has to be supplied with fuel for the winter. A set of fuel tankers just arrived at Johnstown. Couple them and bring them to Altoona. You will have to drop some at AR Track 0. You will have many junctions to change manually. Once arrived at AR Track 0, you will have to reverse into AR Track 0 to deliver the fuel tanks. Have a safe journey. 

Freight 8512
Difficulty: Medium
Duration: 135 minutes
Train: EMD GP7 Pennsy
Date: 18/08/1959
Weather: Clear

You have to transport some gravel from Cresson to Altoona. Once you have delivered the gravel, another task will be asked to you. At Altoona you will have to found your way through the park. Once you train is set, you will have to found your way out of Altoona park again. You will have to pass by Altoona Wwd Freight (orange line) to get out of the park and you will have to be on the second line from the right. If you don’t pass by Altoona Wwd Freight, you will not be able to continue the scenario. You will have many junctions to change manually. Have a safe journey. 

Freight 8581
Difficulty: Hard
Duration: 150 minutes
Train: EMD GP7 Pennsy
Date: 15/11/1958
Weather: Overcast Rain

Today you will drive the "Freight 8581" train. You will start at Johnstown. You will first have to couple a set of gravel freight at Picardi Gravel and transport it to Cresson. Another task will be asked to you once you have finished the first one. To leave Cresson West 2, you have to pass by Cresson West 1. You will have many junctions to change manually. When you leave Johnstown, you must be on the second track from the right. If you are not on that track, you will not be able to continue the scenario. Think about doing backups from time to time. Have a safe journey. 

Freight 8555
Difficulty: Hard
Duration: 140 minutes
Train: EMD GP7 Pennsy
Date: 18/07/1959
Weather: Clear

Today you will drive the "Fright 8555" train. You will start at Gallitzin. You will first have to pick up some freight cars and transport them at Altoona. You will have many junctions to change manually. If you follow the instructions you will found your way without any problem. Have a safe journey.