Home » TRAIN » DOWNLOADS » RAILWORKS » TRAINS AND DRIVERS VOLUME 3 - BAY OF QUINTE 1980


TRAINS AND DRIVERS VOLUME 3 - BAY OF QUINTE 1980

TRAINS AND DRIVERS VOLUME 3 - BAY OF QUINTE 1980

PID: 5946
Available since: 12/05/2011.
Publisher: Trains and Drivers
Sold by Trains and Drivers
Tags: Train 
EUR 5.99
without VAT EUR 5.03
Delivery Method:

           Review it now!     On my Wishlist     BUY NOW! 
HOMEPAGE http://forum.trains-and-drivers.com
SUPPORT info@trains-and-drivers.net
FORUM/FAQ http://trains-and-drivers.eu
DELIVERY METHOD DIRECT DOWNLOAD
FILESIZE 1MB
REGISTRATION KEY This product does not have a registration key, you can simply execute the downloaded file to install
REQUIREMENTS
  • Trainsimulator 2012 installed
  • Bay of Quinte Railway – Route Addon installed.*
  • Wide Nose Sd40-2 AddOn
  • Canadian National Addon
  • GP-9 AddOn
  • Cylindrical hoppers Models from Golden Age of Railroading
  • 40ft Boxcars Models Canadian Pacific from Golden Age of Railroading
  • 40ft Boxcars Models Canadian National from Golden Age of Railroading

*The Bay of Quinte Railway Route and all Rollingstock can be downloaded at railworksamerica.com or at uktrainsim.com. All required Rollingstock can be downloaded in one complete package here

LANGUAGE English

Ride the GP-9* and the SD40-2* on this beautiful canadian Branchline. We bring you eight brandnew scenarios that will keep up the fun for hours!
This package comes in co-operation with golden-age-rails.com and features some brandnew freeware models and repaints done exclusively to enhance your driving-pleasure in this scenario pack!

The Scenarios:

  • Cement Deliveries: Lafarge Cements needs some wagon-loads of sand to maintain theproduction. Your task is the deliverey of the sand starting at Napanee and going viaSandhill Quarry to Lafarge Cement.
  • New Arrival: A train has arrived this morning. Your will have to sort it out, deliver thelocal industries with new goods and take some wagons to Good Year Tires Company.
  • Cementtrain to Napanee: On a foggy marchmorning, you have to take a wholetrain ofcementhoppers from Lafarge Cement to Napanee.
  • Milk Run to Napanee: Drive a local freight with several pickups down the line.
  • Paperwork: Deliver some wagons to Strathcona Paper, sort them to the right tracks andreturn to Napanee with an outgoing train.
  • Evening at the Bay of Quinte: Assemble an outgoing train at Napanee Yard and pick upsome wagons from the surrounding industries.
  • From Lafarge to IGPC Ethanol: Deliver a train to Lafarge Cement and take some wagons toIGPC Ethanol.
  • Winter Run: A complete freight run from south to north on a cold winter day.