Gaziantep Airport (IATA:GZT-ICAO:LTAJ) Gaziantep Airport was opened in 1976. At the airport, where only domestic flights were made at first, international flights were started in 1993.
Gaziantep, which is considered the capital of Turkey in the field of food and local delicacies, is the land of flavors and tastes.
The new and large terminal building at Gaziantep Airport was put into service on 25 December 2021. The new terminal building, where Domestic and International Lines are together, has an area of 72,500 square meters, has 6 passenger bridges, 12 exit gates and 50 check-in desks. passenger capacity 6,000,000 par/year
Within the scope of Gaziantep Airport renovation works, Apron has reached a parking capacity of 18 aircraft. The track was renovated and expanded to 3000 x 48 capacity. The taxiway has been extended by 30 meters. New Taxiways have been added and the Airport approach standard has been raised to Cat II.
Gaziantep airport's passenger capacity is 1,872,000 in total in 2021 on domestic and international lines.
THY, Sun Express, Pegasus operate domestic and international flights.
Fully compatible with FTX Global Base by ORBX
Fully compatible with FTX Global Vector by ORBX
Fully compatible with FTX open LC Europe by ORBX
SODE Visual Docking Guidance System (VDGS)
Animated SODE Jetways
Custom GSX Ground Service settings for scenery (parking’s specifications, vehicles, pushback and boarding services
Dynamic lighting of the apron
High resolution ground textures / Custom runway textures